{"id":2106,"date":"2025-04-28T20:47:16","date_gmt":"2025-04-28T20:47:16","guid":{"rendered":"https:\/\/micon.nuimage.website\/?post_type=projects&#038;p=2106"},"modified":"2025-09-03T17:56:08","modified_gmt":"2025-09-03T17:56:08","slug":"definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan","status":"publish","type":"projects","link":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/","title":{"rendered":"Definitive Feasibility Study on Front End Engineering Design"},"content":{"rendered":"\n<p><strong>The Challenge \/ The Scope:<\/strong><strong><\/strong><\/p>\n\n\n\n<p>Micon was engaged by AzerGold CJSCo to conduct a DFS on the Front End Engineering Design (FEED) of the Chovdar Integrated Gold Project, Azerbaijan. Micon\u2019s scope consisted of providing technical support during drilling and metallurgical testwork, performing an independent Mineral Resource and Ore Reserve estimates in accordance with the JORC (2012) Code and undertaking the FEED and cost estimation.<\/p>\n\n\n\n<p>The main challenge of the Chovdar Integrated Project was the complexity of integrating various ore types from different deposits and the construction of new infrastructure. Specifically, the project had to account for transitional sulphide and oxide ores from the Chovdar deposit and multiple surrounding satellite deposits, and the integration of a new processing plant, tailings management facility and associated infrastructure.<\/p>\n\n\n\n<p>The core business objective was for the project to be able to produce a combined total of 60,000 oz of gold per annum.<\/p>\n\n\n\n<p><strong>Micon\u2019s Approach:<\/strong><\/p>\n\n\n\n<p>Micon conducted Mineral Resource Estimates for Chovdar and its surrounding satellite pits to determine what could be considered to have reasonable prospects for eventual economic extraction (RPEEE), in accordance with JORC (2012).<\/p>\n\n\n\n<p>Detailed pit optimisation was completed for all deposits which exhibited RPEEE, and final pit and pushback designs were generated. The financial and operating conditions inputs were based on current production data and detailed engineering estimates. Micon defined a LOM plan which fulfilled Azergold\u2019s objective of 60,000 oz of gold per annum.<\/p>\n\n\n\n<p>In terms of metallurgical processing, Micon conducted various tests to determine the most effective treatment options for different ore types, including heap leach, conventional CIL (Carbon-In-Leach), flotation, and BIOX\u00ae process. For the comminution process, several flowsheets were examined, including various crushing and milling configurations, to optimize the plant&#8217;s efficiency.<\/p>\n\n\n\n<p>The design of the process plant itself considered factors such as equipment grouping, maintenance access, gravity flow, and material flow, all aimed at maximizing operational efficiency and minimizing costs.<\/p>\n\n\n\n<p><strong>Results:<\/strong><\/p>\n\n\n\n<p>Micon declared Indicated and Inferred Mineral Resources and Probable Reserves for the deposits which make up the Chovdar Integrated Project. Indicated Mineral Resources totaled 37.1 Mt and contained 1,365 koz gold. Inferred Mineral Resource totaled 9.9 Mt and contained 324 koz gold. Probable Reserves totaled 11.53 Mt at a gold grade of 1.60 g\/t Au. In addition to the ore, the pit contains 37.13 Mt of waste resulting in a strip ratio of 3.22 waste tonnes per tonne of ore.<\/p>\n\n\n\n<p>An 8-year strategic LOM plan was defined to exploit the Chovdar deposit and its Satellite deposits. The total gold ounces estimated to be produced over the LOM from the Integrated Project is 452,000 ounces (187 koz from heap leaching and 264 koz from CIL).<\/p>\n\n\n\n<p>The DFS and FEED determined that the preferred process to recover gold from low-grade oxide material is through standard heap leaching and to treat high-grade oxide, transitional and sulphide ore using conventional CIL. Furthermore, the DFS concluded that the optimum gold extraction and economical return is achieved when the gold and sulphur contents are used to classify the ore from the various deposits for extraction through heap leaching or CIL.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_GandR_Drill-Core-with-Sulfides-768x1024.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_GandR_Artisanal-mining-at-old-quarry-1024x768.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Truck-Being-Loaded-1024x768.jpg\" alt=\"\"\/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>DFS and FEED for the Chovdar Integrated Gold Project in Azerbaijan, delivering a mine plan targeting 60,000 oz\/year with optimized processing strategies  for multiple ore types.<\/p>\n","protected":false},"author":4,"featured_media":2291,"template":"","meta":{"_acf_changed":true},"categories":[30,21,33,32,20],"class_list":["post-2106","projects","type-projects","status-publish","has-post-thumbnail","hentry","category-independent-technical-engineer","category-metallurgy-and-process-engineering","category-mineral-resource-estimate","category-project-feasibility-studies","category-reserves-and-mine-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Definitive Feasibility Study on Front End Engineering Design - Micon International<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Definitive Feasibility Study on Front End Engineering Design - Micon International\" \/>\n<meta property=\"og:description\" content=\"DFS and FEED for the Chovdar Integrated Gold Project in Azerbaijan, delivering a mine plan targeting 60,000 oz\/year with optimized processing strategies for multiple ore types.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/\" \/>\n<meta property=\"og:site_name\" content=\"Micon International\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-03T17:56:08+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/\",\"url\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/\",\"name\":\"Definitive Feasibility Study on Front End Engineering Design - Micon International\",\"isPartOf\":{\"@id\":\"https:\/\/micon-international.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg\",\"datePublished\":\"2025-04-28T20:47:16+00:00\",\"dateModified\":\"2025-09-03T17:56:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage\",\"url\":\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg\",\"contentUrl\":\"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg\",\"width\":2560,\"height\":1310},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/micon-international.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/micon-international.com\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Definitive Feasibility Study on Front End Engineering Design\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/micon-international.com\/#website\",\"url\":\"https:\/\/micon-international.com\/\",\"name\":\"Micon International\",\"description\":\"Mineral Industry Consultants\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/micon-international.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Definitive Feasibility Study on Front End Engineering Design - Micon International","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/","og_locale":"en_US","og_type":"article","og_title":"Definitive Feasibility Study on Front End Engineering Design - Micon International","og_description":"DFS and FEED for the Chovdar Integrated Gold Project in Azerbaijan, delivering a mine plan targeting 60,000 oz\/year with optimized processing strategies for multiple ore types.","og_url":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/","og_site_name":"Micon International","article_modified_time":"2025-09-03T17:56:08+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/","url":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/","name":"Definitive Feasibility Study on Front End Engineering Design - Micon International","isPartOf":{"@id":"https:\/\/micon-international.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage"},"image":{"@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage"},"thumbnailUrl":"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg","datePublished":"2025-04-28T20:47:16+00:00","dateModified":"2025-09-03T17:56:08+00:00","breadcrumb":{"@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#primaryimage","url":"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg","contentUrl":"https:\/\/micon-international.com\/wp-content\/uploads\/2025\/05\/Discipline_ME_Open-Pit-scaled.jpg","width":2560,"height":1310},{"@type":"BreadcrumbList","@id":"https:\/\/micon-international.com\/projects\/definitive-feasibility-study-dfs-on-the-front-end-engineering-design-feed-of-the-chovdar-integrated-project-republic-of-azerbaijan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/micon-international.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/micon-international.com\/projects\/"},{"@type":"ListItem","position":3,"name":"Definitive Feasibility Study on Front End Engineering Design"}]},{"@type":"WebSite","@id":"https:\/\/micon-international.com\/#website","url":"https:\/\/micon-international.com\/","name":"Micon International","description":"Mineral Industry Consultants","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/micon-international.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/projects\/2106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/users\/4"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/media\/2291"}],"wp:attachment":[{"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/media?parent=2106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/micon-international.com\/wp-json\/wp\/v2\/categories?post=2106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}